Our project is moving along.

From the President
We had a great turnout Saturday, windows and doors are installed and also the remaining 1x8 pine. Mike Bourett has a trim plan, and the material including another 240 lin. feet of 1x8 pine has been ordered to hopefully finish the job this coming Saturday. Evert took out the permit for the gas lines and is ready for installation. He needs a young guy or two to work with him in the attic. I have promised a material delivery by Friday so we should be good to go. If some has a cutting wheel tool bring it.
Saturday, 11/19/11, Clubhouse Work Party
0700am - Breakfast
at Herb's Deli, Rte 32
0800am - Volunteers needed.

Also, the gutters are packed with leaves. I have a 15 foot step ladder if someone with a truck can pick it up at my house and bring it over.


.