Saturday, February 16, 2013

Saturday Work Party

A group of nine members met at the Mystic Diner just before 7am and waited for them to open. We knew it would not be much of a wait seeing as the wide screen TV's inside had all fired up. The wait was about 5 minutes then we filtered in. Copious amounts of food was inhaled and war stories of the recent snow storm were shared, then at quarter of eight we headed down 95 to exit 88 and the Medical center. From there we headed up the road to meat the rest of the Club members and start work. There was a variety of things to be done from electrical work, sink and cabinet removal, painting, wall construction, and a lot of items to be moved including a computer set up to be taken apart, moved upstairs and re-assembled. Everyone quickly found something to do and went to work.

Looking over expected work

Painting

Measuring and cutting

Ahhhmmm...Distracting the cutters

Waiting for things to dry

Coffee Break

Re-assembling


Being...Kaitlyn

Vandalism...Graffiti Tag

Ham it up


Close-up


Not sure what they are doing, measuring, nailing....leaning on the wall?

Building closet entrance wall


Too much coffee, The subjects not the camera, she didn't flinch when she took this shot.

Installing wall studs

No comments:

Post a Comment